Tilenga Oil Project nears Completion, set for oil production by 2025
With two of the three drills in the Tilenga oil project with Total up and running the oil major says they are 90% ready to start drilling. This comes at the foot of the 2025 date for the first oil to be ready as the country effectively becomes an oil producer.